MoDOT planned road work scheduled for week of October 9, 2017

MoDOT Road Work
Share To Your Social Network

The following is a listing of general highway maintenance and construction work in the North Missouri region planned for the week of October 9 – 15 from the Missouri Department of Transportation.

In addition to the work listed below, there may be pothole patching, bridge maintenance, striping, brush cutting, mowing, guardrail repairs and other road work conducted throughout the region. Many of these will be moving operations and could include lane closures with delays. All scheduled maintenance and construction projects are subject to change.

 

Atchison County

  • U.S. Route 136 – CLOSED at the Little Tarkio Creek for a bridge replacement project. The road will remain closed through December.
  • U.S. Route 136 – Resurfacing project from just east of Route O to just east of Route M, Oct. 9 – 13. A pilot car will direct traffic through the work zone.
  • Interstate 29 – Pothole patching, Oct. 13
  • U.S. Route 136 – Shoulder work from the Rock Creek Bridge in Rock Port to the city limits of Tarkio, Oct. 13

Buchanan County

  • Route DD – CLOSED for a bridge replacement project at the bridge over I-29 at Faucett at Exit 35. The bridge will remain closed through October.
  • I-29 – The on and off ramps at southbound I-29 will be CLOSED for the Route DD Bridge replacement project. Oct. 9 – 15. During this closure, the I-29 frontage road will be accessible from Route DD, but not from the interstate.
  • U.S. Route 59 – Pothole patching from just north of Karnes Road to Country Club Village, Oct. 9 – 13
  • Route 6 – Resurfacing project from Route AC (Riverside Road) to I-29, Oct. 9 – 14. No left turns will be permitted at Frederick Avenue and Leonard Road.
  • Route H – CLOSED for a culvert replacement from Route DD to Route E, Oct. 10, 8 a.m. to 3:30 p.m.
  • Route H – CLOSED for a culvert replacement from Route DD to Route H, Oct. 13, 8 a.m. to 3:30 p.m.

Carroll County

  • Route E – Drainage work from County Road 177 to County Road 165, Oct. 11

Daviess County

  • Route 6 – Milling and pothole patching, Oct. 10 – 13
  • Route 6 – Pavement repair from Route 13 to Route DD, Oct. 10 – 13

DeKalb County

  • Route 31 – Shoulder work from U.S. Route 36 to U.S. Route 169 (Gentry County), Oct. 9 – 13
  • Route EE – Milling and pothole patching, Oct. 10 – 13

Gentry County

  • U.S. Route 169 – Shoulder work from Route 31 to Stanberry, Oct. 9 – 13
  • Route 31 – Shoulder work from U.S. Route 36 (DeKalb County) to U.S. Route 169, Oct. 9 – 13

Harrison County

  • Route TT – CLOSED for a sealing project, Oct. 12, 7 a.m. to 3 p.m.
  • Route P – CLOSED for a sealing project, Oct. 13, 7 a.m. to 3 p.m.

Holt County

  • Route 118 – The ramp from Route 118 to southbound I-29 is CLOSED for the Davis Creek Bridge replacement project through mid-December.
  • I-29 – Bridge replacement project at the Davis Creek Bridge near Exit 84, Oct. 9 – 15.   I-29 will be narrowed to one lane in each direction. This includes a 12-foot width restriction. The lane closures will remain in place overnight.
  • Route 111 – Resurfacing project from the Tarkio River Bridge to Route W in Corning, Oct. 9. A pilot car will direct motorists through the work zone.

Linn County

  • U.S. Route 36 – Pavement repair from the Macon County line to Route 129, Oct. 13

Livingston County

  • Route JJ – Pothole patching, Oct. 11 – 13

Mercer County

  • U.S. Route 136 – Shoulder work from U.S. Route 65 to the city limits of Ravanna, Oct. 10 – 11

Nodaway County

  • Route 148 – Pavement repair from U.S. Route 71 to 220th Street, Oct. 10
  • Route M – Pothole patching from U.S. Route 71 to Route N, Oct. 10
  • U.S. Route 71 – Pothole patching, Oct. 10 – 13
  • U.S. Route 59 – Bridge maintenance, Oct. 13
  • Route V – Pothole patching from Route H to Route 113, Oct. 13

Putnam County

  • Route AA – CLOSED for a culvert replacement from Route 129 to Mayweed Trail, Oct. 11, 7:30 a.m. to 2 p.m.

Sullivan County

  • Route 5 – Pothole patching, Oct. 9 – 13

Worth County

  • Route B – CLOSED for a resurfacing project, Oct. 10 – 13, 8 a.m. to 3 p.m. daily

Share To Your Social Network

Related posts