Road Work

Road and bridge work scheduled in the MoDOT long-range plan in area counties

Besides the resurfacing of Highway 6 through most of Trenton next year, the Missouri Department of Transportation’s long-range plan also shows other roadwork can be expected in Grundy County. As reported earlier, bids are sought this fall for resurfacing 4th street to 65. What’s called preventive maintenance treatment is listed for Highway 69 and Highway […]

Workers resurface a road with asphalt

Part two of I-35 resurfacing project in Harrison County to begin October 1st

Part two of a project which brings a new, smoother surface to Interstate 35 in Harrison County is set to begin. The Missouri Department of Transportation contracted Herzog Construction Company of St. Joseph to resurface I-35 between Route N at Eagleville and the Iowa state line. The contractor completed concrete patching and bridge work earlier […]

MoDOT Laying Ashpalt

Interstate 35 resurfacing project in Harrison County postponed until October 1st

Part two of a project which brings a new, smoother surface to Interstate 35 in Harrison County has been rescheduled. The Missouri Department of Transportation contracted Herzog Construction Company of St. Joseph to resurface I-35 between Route N at Eagleville and the Iowa state line. The contractor completed concrete patching and bridge work earlier this […]