MoDOT road work in north Missouri July 4th through July 10

Road work
Share To Your Social Network

The following is a listing of general highway maintenance and construction work in the Northwest Missouri region planned for the week of July 4 – 10 from the Missouri Department of Transportation.

Most routine work zones will resume at 9 a.m. Tuesday, July 5 for the Independence Day holiday, but some closures may remain in place. In addition to the work listed below, there may be pothole patching, bridge deck washing, striping, brush cutting, guardrail repairs and other road work conducted throughout the region. Many of these will be moving operations and could include lane closures with delays.

 

Andrew County

Route 48 – CLOSED at the Platte River Bridge near Whitesville for a bridge replacement project. The road will be closed through mid-November.

Interstate 29 – NIGHT WORK southbound from Business U.S. Route 71 to 1.5 miles south of Route O (Buchanan County) for a resurfacing project, July 5 – 8 from 6 p.m. to 6 a.m. This includes a 15-foot width restriction.

Atchison County

I-29 – Striping, July 5 – 8

Route B – From U.S. Route 275 to U.S. Route 59 for pothole patching, June 5 – 8

Buchanan County

I-29 – NIGHT WORK southbound from Business U.S. Route 71 (Andrew County) to 1.5 miles south of Route O for a resurfacing project July 5 – 8 from 6 p.m. to 6 a.m. This includes a 15-foot width restriction.

I-229 – Sweeping and flushing bridges July 5 – 7

U.S. Route 36 – At the Platte River Bridge for maintenance July 5 – 8

Route YY – At the Belt Highway and Mitchell Road intersection for a resurfacing project. This project is expected to continue through September.

Caldwell County

Route D – CLOSED from NW Burnett Drive to Route HH for a culvert replacement July 5, 7 a.m. to 3 p.m.

Route D – CLOSED from SW Marble Drive to Route Z for a culvert replacement July 6, 7 a.m. to 3 p.m.

Route D – CLOSED from Route Z to SW Colt Drive for a culvert replacement July 7, 7 a.m. to 3 p.m.

Route D – CLOSED from SW Colt Drive to Route 116 for a culvert replacement July 8, 7 a.m. to 3 p.m.

Carroll County

Route H – From Route C to Route C (Livingston County) for pothole patching July 6 – 7

Chariton County

Route PP – At the Chariton River Overflow Bridge for maintenance July 5 – 6

Route 11 – At the Salt Creek Bridge for maintenance July 7 – 8

Clinton County

I-35 – Southbound from the 48-mile marker to the 52-mile marker just south of Cameron for pavement repair July 5 – 6

Daviess County

Route Y – CLOSED from Hamilton Street to Ridge Avenue for a culvert replacement July 5, 8 a.m. to 3 p.m.

Route P – CLOSED from 280th Street to Route YY for a culvert replacement July 6, 8 a.m. to 3 p.m.

DeKalb County

Route O – From Route 33 to Route J for pothole patching July 5 – 8

Route J – From U.S. Route 36 to Route 6 for pothole patching July 5 – 8

U.S. Route 36 – From I-35 to Sale Barn Road for pavement repair July 6 – 8

Gentry County

Route C – CLOSED at the Weldon Branch Bridge for a bridge replacement project. The bridge will be closed through July.

Route C – CLOSED at the Panther Creek Bridge for a bridge replacement project. The bridge will be closed through August.

Route N – Pothole patching July 5 – 6

Grundy County

Route 146 – At the Raccoon Creek Bridge, Cattail Creek Bridge and the Sugar Creek Bridge for maintenance July 5 – 8

Route NN – Pothole patching July 5 – 8

Route O – Pothole patching July 5 – 8

Harrison County

I-35 – Striping July 5 – 8

Route TT – Pothole patching July 5 – 8

Route CC – CLOSED from East 320th Place to East 330th Street for a culvert replacement July 5 – 8, 7 a.m. to 3 p.m. daily

Route ZZ – Pothole patching July 7 – 8

Holt County

I-29 – At the Nodaway River Bridge for maintenance July 5 – 7. This includes an overnight lane closure

-29 – Striping July 5 – 8

I-29 – From mile marker 84 (Mound City exit) to mile marker 66 (Nodaway River Bridge) for pavement repair July 6 – 8. This includes a 15-foot width restriction.

Linn County

U.S. Route 36 – From Route 139 to Route 130 for pavement repair July 5 – 8

Route U – CLOSED from Noel Drive to Route 129 for a culvert replacement July 7, 7 a.m. to 3 p.m.

Route DD – CLOSED from Route 139 to Clark Drive for a culvert replacement July 8, 7 a.m. to 3 p.m.

Livingston County

Route D – From Route C to the end of state maintenance for pothole patching July 5

Route H – From Route C to Route C (Carroll County) for pothole patching July 6 – 7

Route 139 – From U.S. Route 24 to Route J for pothole patching July 8

Mercer County

Route W – Sealing July 5 – 8

Route CC – Sealing and patching July 5 – 8

Nodaway County

U.S. Route 71 – Northbound single lane closure at the White Cloud Creek Bridge, just north of the Andrew County line, for a bridge deck replacement project July 5 – 8. This includes a 12-foot width restriction.

U.S. Route 136 – From Route F to Route E for shoulder work July 5 – 8

Sullivan County

Route C – CLOSED from Ferris Drive to Roman Road for a culvert replacement July 5 – 6, 7 a.m. to 3 p.m. daily

Route C – CLOSED from Roman Road to Route U for a culvert replacement July 6, 11 a.m. to 3 p.m.

Route O – CLOSED at Route 5 for a culvert replacement July 6, 7 a.m. to 3 p.m.

Route C – CLOSED from Route U to Route P for a culvert replacement July 7, 7 a.m. to 3 p.m.

Route C – CLOSED from Route P to Garden Drive for a culvert replacement July 8, 7 a.m. to 3 p.m.


Share To Your Social Network
Randall Mann

http://www.kttn.com

Randall has been with KTTN/KGOZ for almost 20 years. He is the current Engineer for all of the stations, as well as working "on-air" from 6 to 10, am in the morning. Randall does a bit of everything including producing advertisements as well as writing the occasional news article. Randall is also the current Webmaster for the studio as well as the local graphic artist.

    Related posts