MoDOT planned road work in North Missouri for week of April 9

MoDOT road work and maintenance
Share To Your Social Network

The following is a listing of general highway maintenance and construction work in North Missouri planned for the week of April 9 – 15 from the Missouri Department of Transportation.

In addition to the work listed below, there may be pothole patching, shoulder work, bridge maintenance, striping, brush cutting, guardrail repairs, litter pick up and other road work conducted throughout the region. Many of these will be moving operations and could include lane closures with delays. All scheduled maintenance and construction projects are subject to change.

 

Andrew County

  • U.S. Route 71 – Pothole patching from the city limits of Maryville (Nodaway County) to Route B, April 10 – 13

Buchanan County

  • Interstate 29 – CLOSED for guardrail work on the ramp from northbound I-29 to northbound I-229, April 13, 9 a.m. to 3 p.m.
  • Route DD – CLOSED for a culvert replacement from I-29 to Route MM, April 10 – 12, 7 a.m. to 3 p.m. daily

Caldwell County

  • Route D – Pothole patching from U.S. Route 36 to Route 116, April 9 – 13

Carroll County

  • Route J – Milling and resurfacing project from U.S. Route 65 to Route J, April 11 – 13. This includes a 10-foot width restriction.

Chariton County

  • Route KK – CLOSED for a culvert replacement from Route VV to Moses Hurt Road, April 11, 8 a.m. to 3 p.m.

DeKalb County

  • U.S. Route 36 – Eastbound narrowed to one lane around the Route 33 north/Route M interchange at Osborn for turn lane construction and median work, April 9 – 13, daylight hours
  • Route F – Pothole patching, April 9 – 13

Gentry County

  • Route 111 – Bridge maintenance at the Grand River Creek Bridge, April 9 – 12

Harrison County

  • Route EE – CLOSED for a bridge replacement project at the Muddy Creek Bridge. The road will be closed through May.
  • Route NN – CLOSED for a culvert replacement two miles south of Route 46, April 11, 7 a.m. to 3 p.m.

Holt County

  • U.S. Route 59 – CLOSED for a bridge replacement project at the Davis Creek Bridge. The road will be closed through June.
  • I-29 – Shoulder work north and southbound from mile marker 67 near the Oregon exit to mile marker 84 near Mound City, April 9 – 13

Linn County

  • Route 11 – Bridge maintenance at the U.S. Route 36 overpass, April 9 – 12
  • U.S. Route 36 – Flushing bridges, April 9 – 13
  • Route M – CLOSED for a culvert replacement between Halley Road and Hahn Drive, April 12, 7 a.m. to 3 p.m.
  • Route M – CLOSED for a culvert replacement between Hiver Road and Indigo Road, April 13, 7 a.m. to 3 p.m.
  • Route B – Pothole patching between U.S. Route 36 (Livingston County) and Route 139, April 12 – 13

Livingston County

  • Route H – Milling and resurfacing project from U.S. Route 65 to Route 139, April 11 – 13. This includes a 10-foot width restriction.
  • Route B – Pothole patching between U.S. Route 36 and Route 139 (Linn County), April 12 – 13

Nodaway County

  • Route C – CLOSED for a culvert replacement between Route YY and Route UU, April 10, 8 a.m. to 3 p.m.
  • U.S. Route 71 – Pothole patching from the city limits of Maryville to Route B (Andrew County), April 10 – 13
  • Route 113 – Shoulder and drainage work between U.S. Route 136 and Route 46, April 10 – 13
  • Route YY – CLOSED for a culvert replacement between 180th Street and 155th Street, April 11, 8 a.m. to 3 p.m.
  • U.S. Route 71 – Bridge maintenance at the White Cloud Bridge, April 12
  • Route YY – CLOSED for a culvert replacement between Route C and 180th Street, April 12, 8 a.m. to 3 p.m.

Putnam County

  • U.S. Route 136 and Route 5 – Shoulder work, April 9 – 12

Worth County

  • U.S. Route 275 – Pothole patching, April 9
  • Route 46 – Pothole patching, April 10

Share To Your Social Network

Related posts