MoDOT planned road work for the week of May 7, 2018

MoDOT Road Work
Share To Your Social Network

The following is a listing of general highway maintenance and construction work in the North Missouri planned for the week of May 7 – 13 from the Missouri Department of Transportation.

In addition to the work listed below, there may be pothole patching, shoulder work, bridge maintenance, striping, brush cutting, guardrail repairs, litter pick up and other road work conducted throughout the region. Many of these will be moving operations and could include lane closures with delays. All scheduled maintenance and construction projects are subject to change.

 

Andrew County

  • Interstate 29 – Bridge deck replacement project at the Nodaway River Bridge. Traffic is head to head in the northbound lanes. This traffic pattern will be in place through August and includes a 13-foot width restriction.
  • U.S. Route 71 – Resurfacing project from Route 48 to Route A (Nodaway County), May 7 – 12

Atchison County

  • I-29 – Flushing bridges, May 7 – 11. This includes a 12-foot width restriction.
  • U.S. Route 275 – Drainage work, May 9 – 11

Buchanan County

  • Route DD – Pothole patching at 43rd Service Road, May 7 – 8
  • I-229 and U.S. Route 36 – Sweeping and flushing bridges, May 7 – 10
  • Route 752 – Sidewalk project at Pryor Avenue, May 9 – 11

Caldwell County

  • U.S. Route 36 – Pavement repair from Grindstone Creek (DeKalb County) to Sale Barn Road east of Cameron, May 7 – 11
  • Route 116 – Shoulder work from Route A to U.S. Route 69 (Clinton County), May 7 – 11
  • Route A – Shoulder work, May 7 – 11
  • U.S. Route 36 – Bridge maintenance at the Long Branch Bridge, May 7 – 12

Carroll County

  • U.S. Route 65 – Pothole patching from the city limits of Carrollton to County Road 368, May 7 – 9
  • U.S. Route 65 – Bridge maintenance at Shootman Creek Bridge, May 7 – 10. This will include overnight lane closures and a temporary traffic signal has been installed to direct traffic.
  • Route NN – Shoulder work from Route 139 to the end of state maintenance, May 10 – 11
  • Route D – Pothole patching from Route C to U.S. Route 36 (Livingston County), May 10 – 11

Chariton County

  • Route E – Pothole patching from Route 5 to the Macon County line, May 10 – 11

Clinton County

  • Route 116 – Shoulder work from Route A (Caldwell County) to U.S. Route 69, May 7 – 11

DeKalb County

  • U.S. Route 36 – Pavement resurfacing and realignment project at the Route 33 North/Route M junction. Traffic is head to head in the eastbound lanes. This traffic pattern will be in place through July 3 and includes a 14-foot width restriction.
  • U.S. Route 36 – Guardrail improvements from the Buchanan County line to 1.4 miles west of Route N near Stewartsville, May 7 – 11
  • U.S. Route 36 – Pavement repair in the eastbound lanes from SW Taylor Road west of Stewartsville to the Route 33 North/Route M junction, May 7 – 11
  • U.S. Route 36 – Pavement repair from Grindstone Creek to Sale Barn Road east of Cameron (Caldwell County), May 7 – 11

Gentry County

  • Route V – CLOSED for pavement resurfacing from Route AA to Route H, May 9, 7:30 a.m. to 3 p.m.
  • Route V – CLOSED for pavement resurfacing from Route AA to U.S. Route 169, May 10, 7:30 a.m. to 3 p.m.

Grundy County

  • U.S. Route 65 – Resurfacing project from the north city limits of Chillicothe to the Iowa state line, May 7 – 11. This includes a 12-foot width restriction.

Harrison County

  • Route EE – CLOSED for a bridge replacement project at the Muddy Creek Bridge. The road will be closed through May.

Holt County

  • I-29 – Bridge deck replacement at the Nodaway River Bridge. Traffic is head to head in the northbound lanes. This traffic pattern will be in place through August and includes a 13-foot width restriction.
  • U.S. Route 59 – CLOSED for a bridge replacement project at the Davis Creek Bridge. The road will be closed through June.

Linn County

  • Route B – Pothole patching from Route 5 to Route 139, May 7
  • Route WW – Pothole patching from Route 5 to the Macon County line, May 9
  • Route V – Pothole patching from Route M to Route C, May 9 – 10
  • Route C – CLOSED for a culvert replacement from Route M to Harbor Drive, May 10, 6:30 a.m. to 3 p.m.

Livingston County

  • Route C – Pothole patching from Route Z to U.S. Route 36, May 7
  • U.S. Route 65 – Resurfacing project from the north city limits of Chillicothe to the Iowa state line, May 7 – 11. This includes a 12-foot width restriction.
  • Route DD – Pothole patching from Route C to Route D, May 9
  • Route D – Pothole patching from Route C (Carroll County) to U.S. Route 36, May 10 – 11

Mercer County

  • U.S. Route 65 – Resurfacing project from the north city limits of Chillicothe to the Iowa state line, May 7 – 11. This includes a 12-foot width restriction.

Nodaway County

  • Route 148 – Pothole patching from U.S. Route 71 to the end of state maintenance, May 7
  • Route 246 – CLOSED for a culvert replacement from Route AC to Leopard Road, May 7, 8 a.m. to 3 p.m.
  • U.S. Route 71 – Resurfacing project from Route A to just north of Route 48 (Andrew County), May 7 – 12
  • Route 246 – CLOSED for a culvert replacement from Route AC to Leopard Road, May 9, 8 a.m. to 3 p.m.
  • Route NN – Pothole patching from Route 46 to Route E, May 9
  • U.S. Route 71 – Shoulder work, May 9 – 11
  • Route 246 – CLOSED for a culvert replacement from Lion Road to Mercury Road, May 10 – 11, 8 a.m. to 3 p.m. daily
  • Route NN – Pothole patching from Route E to Route 148, May 10 – 11

Sullivan County

  • Route 129 – Resurfacing project from Route 6 to Route H, May 7 – 12. This includes a 10-foot width restriction. A pilot car and flaggers will direct traffic through the work zone.

Worth County

  • Route M – Shoulder work from Route C to Route EE, May 9 – 11
  • Route 46 – Drainage work at Indigo Road, May 10
  • Route F – Drainage work one mile north of Route 46, May 11

Share To Your Social Network

Related posts