MoDOT: Upcoming road work for week of March 7 through March 13 in North Missouri

Share To Your Social Network

The following is a listing of general highway maintenance and construction work in the Northwest Missouri region planned for the week of March 7 – 13 from the Missouri Department of Transportation. In addition to the work listed below, there may be pothole patching, brush cutting, guardrail repairs and other road work conducted throughout the region. Many of these will be moving operations and could include lane closures with delays.

Andrew County

Route 48 – From County Road 146 to County Road 149; shoulder work, March 7 – 8

Route B – From West Avenue to Route N; shoulder work, March 9 – 11

Atchison County

Route N – CLOSED at the East Fork of the Little Tarkio Creek Bridge; bridge replacement project. The road will be closed through mid-June.

U.S. Route 59 – Pothole patching, March 7 – 9

Interstate 29 – Northbound lanes at the Nishnabotna River Bridge, just south of the Iowa state line; bridge maintenance, March 7 – 10

Route 46 – Pothole patching, March 8

Buchanan County

I-229 – Sealing, March 7 – 11

Caldwell County

Route 116 – From Route D to U.S. Route 69 (Clinton County); sealing, March 7 – 11

Carroll County

Route DD – Drainage work, March 7 – 9

Route D – From Route C to the Mooresville city limits (Livingston County); pothole patching, March 7 – 8

Routes D and E – Pothole patching, March 8 – 11

Route F – From Route C to Route C (Livingston County); pothole patching, March 11

Clinton County

Route O – CLOSED from Smith-Halferty Road to SW Shewey Road; culvert replacement, March 7, 8 a.m. to 3:30 p.m.

Route 116 – From U.S. Route 69 to Route D (Caldwell County); sealing, March 7 – 11

Route O – CLOSED from SW Shewey to SW Hord Road; culvert replacement, March 8 – 9, 8 a.m. to 3:30 p.m. daily

Daviess County

I-35 – From Route C (mile marker 78) to Route AA/H (mile marker 84, Harrison County); sealing and pothole patching, March 7 – 11

DeKalb County

Route A – CLOSED at the North Fork Lost Creek Bridge; bridge maintenance, March 7 – 10, 7:30 a.m. to 3 p.m. daily

Route EE – CLOSED from Gridley Road to Wamsley Road; culvert replacement, March 10, 9 a.m. to 3:30 p.m.

Harrison County

I-35 – From Route AA/H (mile marker 84) to Route C (mile marker 78, Daviess County); sealing and pothole patching, March 7 – 11

U.S. Route 69 – From Route 46 to Route N; drainage work, March 7 – 11

Route M – U.S. Route 69 to Route D; sealing, March 7 – 11

Route 46 – CLOSED from Route NN to Route HH; culvert replacement, March 9, 8 a.m. to 1 p.m.

Holt County

Route D – CLOSED from Route C to Pebble Road; culvert replacement, March 7 – 9, 7 a.m. to 3 p.m. daily

Linn County

Route 11 – From Route C to Route 129; shoulder work, March 7 – 8

U.S. Route 36 – From Route 139 to the Macon County line; pothole patching, March 7 – 11

Livingston County

Route D – From the Mooresville city limits to Route C (Carroll County); pothole patching, March 7 – 8

Route C – From U.S. Route 36 to Route Z; pothole patching, March 9 – 10

Route F – From Route C to Route C (Carroll County); pothole patching, March 11

Nodaway County

U.S. Route 71 – From County Road 352 to County Road 330; utility work, March 7

Route HH – Pothole patching, March 7

Route V – CLOSED from Glacier Road to Fortune Road; culvert replacement, March 8, 7 a.m. to 3 p.m.

Route 46 – Pothole patching, March 9 – 11

Putnam County

U.S. Route 136 – From Route H to Route K; drainage work, March 7 – 11

Route 5 – From U.S. Route 136 to Route B; drainage work, March 7 – 11

Sullivan County

Route 6 – Drainage work, March 7 – 11

Route BB – CLOSED from Jerico Road to Jester Road; culvert replacement, March 9, 7 a.m. to 11 a.m.

Route BB – CLOSED from Joiner Road to Kite Road; culvert replacement, March 9, 11 a.m. to 3 p.m.

Route 129 – CLOSED from Table Road to Ivory Road; culvert replacement, March 10, 8 a.m. to 2 p.m.


Share To Your Social Network
Randall Mann

http://www.kttn.com

Randall has been with KTTN/KGOZ for almost 20 years. He is the current Engineer for all of the stations, as well as working "on-air" from 6 to 10, am in the morning. Randall does a bit of everything including producing advertisements as well as writing the occasional news article. Randall is also the current Webmaster for the studio as well as the local graphic artist.

    Related posts