MoDOT Maintenance Schedule For North Missouri Week Of May 12

Date 2014/5/12 4:45:05 | Topic: News

MoDOT is once again busy on highways and roads in North Missouri. Many road closings have been announced.
Original Image
Caldwell County
Route F – CLOSED from Route A to SE Headquarters Road; culvert replacement, May 12, 6:30 a.m. to 3 p.m.
U.S. Hwy 36 – From I-35 (Clinton County) to Route 13; striping, May 12 – 13
U.S. Hwy 36 – From the Livingston County line to I-35 (Dekalb County); mowing, May 12 – 16
Various routes – Spraying, May 12 – 16
Various routes – Mowing, May 12 – 16
Route F – CLOSED from SE Headquarters Road to Catawba Road; culvert replacement, May 13, 6:30 a.m. to 3 p.m.
Route F – CLOSED from Catawba Road to Route B; culvert replacement, May 14, 6:30 a.m. to 3 p.m.
U.S. Hwy 36 – From Route 13 to the Livingston County line; striping, May 14 – 15
Route F – CLOSED from NE Wingate to SE Wildlife Road; culvert replacement, May 15, 6:30 a.m. to 3 p.m.
Route F – CLOSED from Hazelview Road to SE Yankee Ridge Road; culvert replacement, May 16, 6:30 a.m. to 3 p.m.

Daviess County
Route KK – CLOSED from 110th Street to 120th Street; culvert replacement, May 13, 8 a.m. to 2 p.m.
Route BB – Over I-35; bridge maintenance, May 12 – 16 (Includes a 10-foot width restriction and temporary traffic signals.)
I-35 – From the Winston exit to the Cameron exit; mowing, May 12
I-35 – At the Coffey truck parking facility; concrete replacement, May 12 – 15 (Limited parking spaces will be available.)
I-35 – Pavement repair, May 12 – 16 (Includes a 13-foot width restriction.)
Various routes – Spraying, May 12 – 16
I-35 – Southbound from mile marker 68 north of Winston to the DeKalb/Clinton County line; resurfacing project, May 12 – 16 (Includes a 13-foot width restriction.)
I-35 – At the Grand River Bridge and the Granite River Bridge; sweeping and flushing bridges, May 14 – 16

Grundy County
Route 6 – From just east of the Trenton city limits to the Sullivan County line; sweeping and flushing bridges, May 12 – 16
Routes A, C, B and Y – Spraying, May 12 – 16
Various routes – Sign operations, May 12 – 16
Route C – In the Spickard city limits; drainage work, May 14

Harrison County
I-35 – Southbound from mile marker 114 near the Iowa state line to mile marker 110 near Eagleville; sweeping and flushing bridges, May 12
Route A – At the Indian Creek Bridge; bridge maintenance, May 12 – 14 (Includes a 12-foot width restriction and temporary traffic signals.)
Route ZZ – Pothole patching, May 12 – 16
I-35 – Northbound from mile marker 110 near Eagleville to mile marker 114 near the Iowa state line; sweeping and flushing bridges, May 13

Linn County
Route B – CLOSED at the Locust Creek Bridge; bridge replacement, closed through May 2014
Route EE – Pothole patching, May 12 – 14
U.S. Hwy 36 – From the Macon County line to Route 139; mowing, May 12 – 16
Route 11 – From Route 129 to Route F; shoulder repair, May 12 – 16
Route M – From Route O to Route 11; pothole patching, May 12 – 16
Route 11 – From Route 129 to U.S. Hwy 36; spraying, May 12 – 16
Route 139 – From Route DD to U.S. Hwy 36; spraying, May 12 – 16
Route 5 – From Route O to U.S. Hwy 36; spraying, May 12 – 16
Route 129 – From Bucklin to Route J; sidewalk improvement project, May 12 – 16
Route B – From the Livingston County line to Route 139; pothole patching, May 14 – 16

Livingston County
Route B – From U.S. Hwy 36 to the Linn County line; pothole patching, May 14 – 16
U.S. Hwy 36 – From the Livingston County line to U.S. Hwy 65; striping, May 16

Mercer County
Route K – From U.S. Hwy 65 to the Iowa state line; milling, May 12 – 16 (Includes a 10-foot width restriction.)
Routes E, J, JJ, Y, C, AA, M, Z and W – Spraying, May 12 – 16
U.S. Hwy 65 – Mowing, May 12 – 16
U.S. Hwy 136 – Mowing, May 12 – 16

Putnam County
Route U – From U.S. Hwy 136 to the Iowa State line; milling, May 12 – 16 (Includes a 10-foot width restriction.)
Route W – From Route 149 to U.S. Hwy 136; pothole patching, May 12 – 16
Routes 129, AA, W, F, O, and VV – Spraying, May 12 – 16
Routes W, EE, E, K, KK and O – Sign operations, May 12 – 16
Route 129 – One mile north of U.S. Hwy 136; drainage work, May 14

Sullivan County
Route OO – Pothole patching, May 12 – 15
Route 139 – From the Newtown city limits to Route PP; pothole patching, May 12 – 16
Route 139 – From Route E to the Putnam County line; pothole patching, May 12 – 16
Route N – At the East Locust Creek Bridge; bridge maintenance, May 12 – 16
Route 6 – From Route W to the Grundy County line; sweeping and flushing bridges, May 12 –



This article comes from KTTN-FM AND KGOZ-FM
http://www.kttn.com/kgozfm

The URL for this story is:
http://www.kttn.com/kgozfm/modules/news/article.php?storyid=12363